Production of concrete poles
Producer N° 1 in MALI
Unit of production located in Bamako-26 molds with a possibility to increase the number to 41 moldsif there is a need.
A possibility to bring the mobile unit for the production of large quantity in other regions or in other country in the sub-region.
The quality of the production of GTMH's reinforced concrete poles is based on:
- A strict respect of French norms of fabrication of concrete poles C67-200
-The verification is done by the bureau d'études INEO GDF SUEZ and adapted to the conditions of every contract.
- An opportunity to produce class A and Class B poles
- An Opportunity to test the poles on GTMH bench
- A monitoring of quality and traceability of every support
- A quality of incorporated equipments
- A respect of delivery deadlines
- An opportunity to deliver by truck or by train
Year
|
Customer
|
Number
|
Contract
|
Supplies
|
Installation
|
|
 |
 |
1989/1991
|
EDM
|
500
|
Concrete poles class A&B |
o
|
o
|
1997
|
EDM
|
3 400
|
Concrete poles class A&B
7 external centers |
o
|
o
|
1997
|
RMT/EDM
|
1 400
|
Concrete poles class A&B |
o
|
|
1997
|
EDM
|
4 500
|
Concrete poles class A&B |
o
|
|
1998
|
EDM
|
2 200
|
Concrete poles class A&B |
o
|
|
2000
|
EDM
|
1 500
|
Concrete poles class A&B |
o
|
|
2003/2004
|
EDM
|
1 830
|
Concrete poles class A&B |
o
|
o
|
2005/2006
|
EDM/ACI
|
2 500
|
Concrete poles class A&B |
o
|
o
|
2007/2008
|
EDM/CTEXCEI
|
3 000
|
Concrete poles class A&B |
o
|
o
|
2009/2010
|
EDM/Diver
|
2852
|
Concrete poles class A&B |
o
|
o
|
2010/2011 |
EDM/SOGEM |
1915
|
Concrete poles class A&B |
o
|
o
|
|
2011/2012 |
Divers |
888
|
Concrete poles class A&B |
o
|
o
|
 |
|
|
Total: 26 485 |
|
|
An opportunity to deliver by truck or by train in every part of the country
Used to deliver (1800 poles) to Mahina by train
|
|
26 molds set up ( / 41 available )
9 to 14 m
Classe A and B
|
Pouring according to French norm NF C67-200
|
|
|
Transport of support is done by appropriate trunck to the site.
|
|
|